Menu
Aviation
Search
Your Vision Is Our Mission
Garver plans with your future in mind. We examine how our designs influence airfield functionality and how construction activity impacts operations. Our smart planning maximizes funding, schedules, and usability.

From general aviation to international air carrier facilities, the Garver Aviation Group develops innovative, cost-conscious, and sustainable solutions to enhance your airport's safety and utilization.


This is the engineering firm I fell in love with many years ago; the one who would figure out a way to get us funding and make it happen.

Judy McCutcheon
Airport Manager
Boone County Regional Airport

  •  

    Large jets overloaded the runway and parallel taxiway, which were rated in the 12,500-pound weight classification. Grass and weeds spread through large cracks in the asphalt pavement. Drainage problems weakened the subgrade. Sulphur Springs Municipal Airport in east Texas desperately needed to improve...

  •  

    When a primary runway at Nashville International Airport in Tennessee required full-depth reconstruction, Garver pursued a progressive concrete-recycling method to reuse the pavement and save the client millions of dollars. Traditional runway reconstruction normally involves breaking and removing...

  •  

    Garver has a role in designing and managing projects that change how the private sector of the U.S. economy is able to do business on both the national and world stage. That's nowhere better illustrated than the upgrading of Huntsville International Airport, moving this facility into a category of select...

  •  

    Soaring down the runway, the F-16 Fighting Falcon dropped its tailhook and snagged the arresting cable that spanned the pavement. With a whirl and a snap, the steel wire and nylon tape unreeled and stretched like a taut rubber band, bringing the fighter jet to a controlled stop after its emergency landing. As...

  •  

    With both city and state owners responsible for taxiway work at Ada Municipal Airport, meticulous project management became vital to its success—especially when the $1.5 million realignment expanded into a $5.5 million enterprise. On behalf of the City of Ada, the Oklahoma Aeronautics Commission...

  •  

    Following a feasibility study in 2007, the Little Rock Municipal Airport Commission launched an ambitious terminal redevelopment plan called the 2020 Vision. This plan will replace, renovate and expand the existing terminal facility—unveiled in 1972—by adding an expanded and remodeled ticket...

  •  

    Once airfield pavement deteriorates to the point that an overlay or complete reconstruction is required, the pavement repair costs can be five times more expensive than if the airport had utilized preventative maintenance techniques. By scheduling crack cleaning, patching and seal coating procedures...

  •  

    Northwest Arkansas Regional Airport (XNA) has experienced significant growth in the past decade and has modified and expanded its electrical systems to keep pace. Airport officials recently sought Garver's professional services to ensure that their electrical systems are code compliant. The 2012 National...

  •  

    Meacham International Airport in Fort Worth, Texas is one of the oldest continuously operating airports in the state. Its role has changed dramatically in the last decade from that of a training and general aviation airport serving the occasional passenger carrier to one of the metroplex's most active...

  •  

    Auburn University Regional Airport in Auburn, Ala. faced a unique challenge during its taxiway extension project—contending with an abandoned, capped landfill. The airport extended Taxiway Charlie by 2,200 feet, including two connecting taxiways. This extension connects the Runway 36 threshold...

  •  

    As one of the busiest single-runway general aviation airports in the nation, Addison Airport in Texas couldn't simply shut down its runway to reconstruct and overlay the aging asphalt. The airport's bustling status necessitated an aggressive approach to extend the pavement's life while keeping the...

  •  

    Today's new airports have to meet a complex network of industry, land, environmental, design, funding and agency regulations. They require grant applications, a feasibility study, site selection, master and airport layout plans, an environmental impact analysis, design and construction. And don't forget...

Capabilities

Air Carrier
  • Runways
  • Aprons
  • Runway Safety Areas
  • Land Development
  • Automated Weather Stations
General Aviation
  • Taxiways
  • Hangars
  • Fuel Farms
  • Fencing
  • Roadway and Parking
Planning
  • Airport Master/Development Plans
  • ALP/e-ALP
  • Airport Business Plans
  • Feasibility Studies
  • Site Selection Studies
Electrical and Lighting
  • Airfield Visual Aids
  • NAVAIDs
  • Signage
  • Power and Controls
  • Security Systems
Environmental
  • Environmental Assessments
  • Wetland Delineation
  • Cultural Resource Survey
  • Public Involvement
  • Agency Coordination
Military Airfields
  • Air Traffic Control Towers
  • Airfield Pavement
  • Access Control
  • Drainage
  • Arresting Barriers
 

Services

  • Design
  • Surveys
  • Construction Observation
  • Environmental Assessments
  • Land Acquisition
  • Bidding Services
  • Planning
  • Project Phasing
  • Funding Administration
  • Pavement Analysis
  • Power and Controls
  • Electrical Analysis
 

Inside Garver

Smith Elected to Head Arkansas Post of SAME Smith Elected to Head Arkansas Post of SAME
The Arkansas Post of the Society of American Military Engineers (SAME) recently elected Garver Director of Federal Services...
Engineering Students Visit Garver Tulsa Office Engineering Students Visit Garver Tulsa Office
Incoming freshmen at the University of Arkansas recently visited Garver’s Tulsa, Oklahoma office. The students are part...
Zweig Group Names Garver to 2015 Hot Firm List Zweig Group Names Garver to 2015 Hot Firm List
For the fifth year in a row, Garver is ranked in the Zweig Group Hot Firm List, which recognizes the 100 fastest-growing...
Garver Team Wins LT100 MTB Stage Race Garver Team Wins LT100 MTB Stage Race
A Garver-sponsored bicycling team recently won 1st place at the 2015 Leadville MTB Stage Race, which took place in the...

 

Infrastructure Quarterly

Director's Insight Director's Insight
Garver Remembers Former President Ted Hannah
SR-7 Over Tallahatchie River SR-7 Over Tallahatchie River
Bridge Replacement
Nashville International Airport Nashville International Airport
Runway 13-31 West Improvements
Springdale Water Utilities Springdale Water Utilities
Capital Improvement Planning
IQ - Infrastructure Quarterly, Garver's Quarterly Newsletter.

Inside Garver - Garver's Blog.

Careers - Career opportinities with Garver.

Follow Us



Who We Are  |   Markets  |   Awards  |   Blog  |   Planroom  |   IQ Magazine  |   Locations and Contacts  |   Join Us
Transportation  |   Aviation  |   Water  |   Federal  |   Facilities Design  |   Power  |   Development  |   Construction Services  |   Survey  |   AssetMax
Terms of Use  |   Site Map  |   Employee Access  |   FTP

By using this web site, you accept the terms of use. ©2013 Garver