Replenishing a Water Supply
The goal of the program is to supplement the groundwater supply in Enid, Oklahoma with a new 50-year sustainable water supply. Garver is serving as the program manager, lead designer, and site representative for the new intake structure on the Kaw Reservoir, 70 miles of 36-inch raw water pipeline, a 10.5 MGD advanced water treatment plant (expandable to 21 MGD), terminal storage reservoirs, and an optimized delivery system for proper blending with local groundwater. Extensive multi-agency review and approval was required. Garver’s design is focused on achieving compliance with Safe Drinking Water Act standards and regulations with a multi barrier approach as well as removing offensive taste and odor compounds common in surface water reservoirs.
Share this article