Garver’s Aviation Electrical Engineering Team provided engineering design services to upgrade lighting distribution to meet industry standards, providing new, more energy efficient lighting at Dallas Love Field's terminal; (remain overnight) RON A, RON B, RON C; along with a generator area, terminal bridge, and three de-icing areas adjacent to RON C.
Garver resolved insufficient light levels, glare issues, and drastically reduced lighting maintenance costs throughout the airport by replacing metal halide with more energy efficient LED lighting for general illumination at night.
Share this article