BNA Feasibility Study
Garver provides feasibility study and alternatives analysis for taxiway relocations
A feasibility study at Nashville International Airport resulted in more efficient operations by redesigning the taxiway intersection and holding bay at Runway 20C. To identify the most efficient taxiway layout, Garver’s Aviation Team analyzed operations by scheduled air carriers, cargo carriers, general aviation, and military traffic to support the myriad of existing and anticipated operations. Complications existed by the need of an additional taxiway, which was converted to a non-movement area. Garver also completed a line-of-sight study for the air traffic control tower.

Share this article