Federal

Fort Sill Water Infrastructure Upgrades

Strengthening Fort Sill’s Water and Wastewater Infrastructure

For more than a decade, Garver has planned, designed, and provided construction phase services for pump stations, storage, and distribution improvements on more than 120,000 linear feet of water lines up to 21 inches in diameter. Garver also provided construction administration, design, and plans for wastewater treatment plant improvements, lift stations, wastewater treatment lagoons, and collection system improvements on more than 95,000 linear feet of wastewater lines up to 21 inches in diameter. Garver continues to maintain and update the military installation’s detailed hydraulic model and assist with the development of capital improvements plans, ensuring that Fort Sill maintains sustainable water and wastewater infrastructure.

Share this article