Field Services
IH 27 at Yucca Lane Bridge Replacement
Garver provides CEI services for projects that improve safety in Lubbock County, TX
Garver provided Construction Engineering Inspection (CEI) services for IH 27, from 0.5 miles South of Yucca Lane to 0.5 miles North of Yucca Lane, which included the demolition and raising of the Yucca Lane Bridge and braided ramps to the south to meet new Texas Department of Transportation (TxDOT) freight corridor and bridge design standards. This is part of a $24.3M TxDOT project designed to improve mobility and safety in Lubbock County.
Share this article