Garver was selected to perform a wastewater treatment facility master plan for the Springdale Wastewater Treatment Facility in Arkansas. The master plan includes wastewater characteristics and loading assessments, field assessments and verifications, development of planning criteria, hydraulic and process modeling, several technical evaluations, plant layout development, and capital improvement planning with the owner. The technical evaluations include industrial loading mitigation, electrical service and standby power, instrumentation, controls, SCADA, risk and resiliency, influent pump station, odor control, headworks, plant water system, solids management, tertiary filtration, alternative disinfection, and gap analysis. The capital improvement planning was based upon the full build out, and short-term capital improvements will be prioritized and phased.
Share this article